WorkSafeBC OHS Regulation Part 3 — s.3.3
JSA and FLHA templates
built for
BC job sites.
One document covers both your Job Safety Analysis and Field Level Hazard Assessment. Hierarchy of controls built in. Toolbox talk and crew briefing sign-off included. BC OHS Regulation Part 3 referenced throughout.
✓
BC OHS Regulation Part 3 s.3.3
✓
Hierarchy of controls built in
✓
Toolbox talk sign-off included
Built around the regulation
Hierarchy of controls. Sequenced correctly.
Most generic JSA templates list controls as a free-text field. This one sequences them correctly — elimination first, PPE last — matching the WorkSafeBC OHS Regulation requirement under Part 3.
WORKSAFEBC HIERARCHY OF CONTROLS — s.3.3
1
Eliminate
Remove the hazard entirely from the workplace
2
Substitute
Replace with something less hazardous
3
Engineering
Isolate people from the hazard
4
Administrative
Change the way people work
5
PPE
Protect the worker — last resort
What's included
Analysis table. Hazard checklist. Crew briefing. One form.
- ✓ Fillable Word document (.docx) — edit on any device, print on site
- ✓ Job information: task description, 8 work type checkboxes, supervisor details
- ✓ 12-category hazard identification checklist to review before analysis
- ✓ 8-step JSA analysis table: Task Step / Hazards / Controls / Residual Risk
- ✓ Hierarchy of controls (E→S→Eng→A→PPE) built into the table header
- ✓ Residual risk rating (High / Medium / Low) per step
- ✓ Additional controls / site-specific notes field
- ✓ Supervisor authorization signature before work begins
- ✓ Toolbox talk briefing notes field
- ✓ 8-worker crew briefing sign-off table
- ✓ Closing supervisor confirmation — all workers briefed before work starts
- ✓ Revision number field for document control
- ✓ BC OHS Regulation Part 3 s.3.3 referenced throughout
Regulatory Basis
RegulationBC OHS Reg. Part 3
Risk assessment requirements.3.3
Hierarchy of controlsPart 3 s.3.12
Works as JSA✓ Yes
Works as FLHA✓ Yes
Toolbox talk record✓ Built in
Crew sign-off✓ 8 workers
FormatEditable .docx
Who it's for
Every BC contractor who puts workers in front of hazards.
Small Contractors & Owner-Operators
If you're doing pre-job planning without a safety coordinator, this form keeps you compliant and documented without taking 45 minutes to fill out.
Pipeline & Utility Crews
High-hazard tasks with multiple workers need a documented analysis before work starts. This form covers the analysis and crew briefing in one document.
Mechanical & Construction
Hot work, working at heights, energized equipment — the work type checkboxes and hazard category grid ensure nothing gets missed before the job starts.
Safety Officers Building Programs
Whether you're building a COR-ready safety program or need a solid daily FLHA for a small crew, this template is the foundation.
Get the template
Briefed, documented, and ready to work.
One form. Pre-job hazard analysis, crew briefing, and supervisor sign-off — all in a single editable Word document.
$57CADone-time
Download Now — Instant Access
Word document (.docx) · Instant download · No subscription
Need the confined space permit too? Save $27 with the Starter Bundle →
This template is a professional working tool. All documents must be reviewed by a qualified person prior to use and verified against the current WorkSafeBC OHS Regulation. Not legal or regulatory advice.